Architectural Metals & General Contracting
1040 S. Andreasen Dr., Ste. 110, Escondido, CA 92029
P: 760/741-8292  F: 760/741-8022
CA License # : 671214
Projects





UC Schools/ College Level
Palomar College High Technology Lab: (Subcontractor, San Diego, CA)  Projected completion date: August 2007.

UCI Student Center Expansion & Renovation Phase 4: Project 991393: (Subcontractor, Irvine, CA)  Expansion Joints, Metal Panels, Siding, Soffit Column
Covers, Mechanical Screen, Aluminum Stair Tower Fins, Flashing & Sheet Metal, Hatches, Skylights, Anteaters.  Projected Completion date: 2007.

UCR Commons Expansion: (Prime contractor, Riverside, CA)  Procure and install, 250 sqs composite metal wall panel, 50 sqs preformed metal, 150 sqs
metal liner panel, aluminum framing for trellis, custom metal coping, sheet metal, louvered sunshades, expansion joints, preengineered metal structure
framing.  Completed date: July 2007.  

Science & Engineering Building at UC Merced: (Prime contractor, Merced, CA)  Procure and install 600 sqs. Pre-formed metal over polyisocanurate
insulation, 250 sqs. Metal liner panel, 120 sqs metal siding panels, sheet metal, pre-engineered metal structure framing.  Completed date: April 2007.  

UCSD Pharmaceuticals: (Subcontract, San Diego, CA)  Procure, fabricate and install composite metal panels, custom  fabricated aluminum storefront
panels, preformed metal siding, aluminum sunshades, expansion joints and sheet metal.  Completed date: July 2006.  

UC Merced Library: (Merced, CA)  Completed date: December 2006.  

Grossmont College Science Building Increment #2: (Subcontractor, El Cajon, CA)  Composite metal cladding system, sheet metal, metal envelope, and
hatch.  Completed date: October 2006.

UC San Diego-Pharmaceutical Science Bldg.: (La Jolla, CA)  Completed date: October 2006.

UC Merced-Science Bldg.: (Merced, CA)  Completed date: December 2005.  

Humanities Building, Mesa College: (San Diego, CA)  Furnish and install 11,000 square feet of radius  tapered metal panels, custom translucent skylight
system in a conical shape, custom miscellaneous steel to support skylight system, composite metal wall panels and miscellaneous sheet metal and
expansion joint.  Completed date: 2002

Student Housing: (UC Riverside, CA)  Furnish and install 95,000 square feet of new metal over 30 lb. underlayment.  Completed date: 2001

Preuss School @ UCSD: (La Jolla, CA)  Furnish and install 30,000 square feet of new radiused metal, over metal deck, polyisocanurate insulation,
bituthane underlayment, associated sheet metal trim, downspouts, hatches and unit skylights. Completed date: 2000

Contained Research Facility: (Subcontractor, UC Davis, CA)  Metal wall panels, trim, fascia copings and rain water leaders.  Completed date: January 1998.

Corporation Yard: (CAL State Long Beach, CA)  Abatement of asbestos containing materials, demolition of 15,000 square feet of existing metal envelope,
replace with corrigated decking. Completed date: 1999


High Schools
Lincoln High School: (Prime contractor, San Diego, CA)  Procure  and install 940 sqs. Preformed metal, 400 sqs metal liner panel, 50 sqs of composite
wall panel light gauge metal framing, translucent skylight panels, accessories, louvers, sheetmetal.  Completed date: January 2007.  

High School #13: (Prime contract, Chula Vista, CA)   Procure and install 1200 sqs.  Preformed metal, 150 sqs metal siding liner panel, light gauge
structural steel framing, louvers, and translucent panel skylight system. Completed date: March 2007.  

Twelve Bridges High School: (Subcontractor, Sacramento, CA)  Procure and install 800 sqs. radiused performed metal envelope and siding, metal liner
panels, miscellaneous architectual metals, expansion joints, louvers.  Completed date: July 2006.

Sweetwater High School Modernization: (Chula Vista, CA)  Furnish and install 17,000 square feet of curved Select Seam metal over Lastobond premium
underlayment over R:19 polyiso rigid insulation, with 7,000 square feet of accent color curved Select Seam metal, miscellaneous sheet metal integral,
accessories and louvers. Completed date: 2002

Mar Vista High School Modernization: (Chula Vista, CA)  Furnish and install 17,000 square feet of curved Select Seam metal  over Lastobond premium
underlay over R:19 polyiso rigid insulation, with 7,000 square feet of accent color curved Select Seam metal, miscellaneous sheet metal integral,
accessories and louvers.  Completed date: 2002

Paloma Valley High School: (Menifee, CA)  Furnish and install 30,000 square feet of new metal over 30 lb. underlayment at four buildings and all
associated sheet metal trim.  Completed date: 2001

San Marino High School-Phase IIIB: (San Marino, CA)  Furnish and install 29,000 square feet of new metal over 30 lb. ASTM underlayment, Z-purlins, repair
built-up and associated sheet metal trim.  Completed date: 2001


Elementary/Middle Schools

Laura Rodriquez: (Prime contractor, San Diego, CA)  Procure and install 400 sqs preformed metal, sheetmetal and flashing, architectural metals, metal
liner panel.  Completed date: July 2007.

Lakeland Village Middle School: (Subcontractor, Lake Elsinore, CA)  Preformed aluminum wall panel, preformed metal panel, prefinished composite
panel, sheet metal flashing & trim, roof accessories, joint sealers, and metal wall louvers.  Completed date: December 2005.  

Ronald Regan Elementary School: (Subcontractor, Wildomar, CA)  Preformed Metal , Sheet Metal Flashing and Trim, Accessories, Joint Sealants, Metal
Wall Louvers.  Completed date: June 2005.  

Sunset Elementary: (San Ysidro, CA)  Furnish and install 42,000 square feet Design Span metal over 30 lb. underlayment, miscellaneous sheet metal trim
and accessories, custom translucent skylight, hatches with mounted hand rails and ladder ups, expansion joints and louvers.  Completed date: 2002

Bell Junior High School: (San Diego, CA)  Furnish and install 9,200 square feel Flush ceiling panels, miscellaneous sheet metal and louvers, for Prop MM
school remodel. Completed date: 2002

Valley Community School: (El Centro, CA)  Furnish and install 44,400 square feet of Design Span metal  over 30lb. underlayment, 21,200 square feet of
Box Rib siding, custom fabricated sunshades.  Completed date: 2002

Del Rio Community School: (Brawley, CA)  Furnish and install 27,700 square feet of Design Span metal over 30lb. underlayment, 22,900 square feet of Box
Rib siding, custom fabricated sunshades.  Completed date: 2002

Cottonwood Canyon Middle School: (Lake Elsinore, CA)  Furnish and install 82,500 square feet of new T-Seam metal over 30lb. underlayment, over R:19
polyiso rigid insulation 24,000 square feet of integral sheet metal associated, custom installation of insulated Composite Wall Panel.  Completed date:
2002

Madison Middle School: (Oceanside, CA)  Furnish and install 40,000 square feet of new metal over bituthane underlayment, associated sheet metal trim,
architectural wall panels, hatches and louvers.  Completed date: 2001

Otay Ranch Village 1 Elementary School: (Chula Vista, CA)  Furnish and install 75,000 square feet of new metal, three different profiles over 30 lb. ASTM
underlayment, associated sheet metal trim and roof accessories.  Completed date: 2000

Jefferson Elementary School: (Carlsbad, CA)  Furnish and install 60,000 square feet of new metal over 30 lb. underlayment, associated sheet metal trim,
hatches, unit skylights, translucent skylights and access hatches with ladders.  Completed date: 2000

Woodbridge School Phase II: (Irvine, CA) Remove existing and replace with 17,000 square feet of new metal  over 30 lb. ASTM underlayment and
associated sheet metal trim.  Completed date: 2000

Eastlake Trails Elementary School: (Chula Vista, CA)  Custom horizontal application of 70,000 square feet of Bermuda metal over 1 layer of 30 lb. felt
underlayment, over metal deck.  Scope also included 5,500 LTF of custom fascias, louvers and tapered panels.  Completed date: 2000

Three Rivers High School: (Three Rivers, MI)  Installation of 250,000 square feet of Supraspan metal  over 250,000 square feet of 3" poly ISO laminated to
OSB Board over 16 gague metal deck, installation of 5,000 square feet of hypalon, snow jacks and smoke hatches.  Completed date: 1998

Rosa Parks School: (San Diego, CA)  Furnish and install 50,000 square feet of radius standing seam metal  over Grace Ice & Water Underlayment, over 3"
Poly ISO Insullation, over 20 gauge metal deck.  Scope included all related sheet metal and custom translucent skylight walls.  Completed date: 1997