|
Architectural Metals & General Contracting 1040 S. Andreasen Dr., Ste. 110, Escondido, CA 92029 P: 760/741-8292 F: 760/741-8022 CA License # : 671214
|
|
|
 |
|
|
|
|
|
|
|
|
|
2007 Miramar Water Treatment Plant: (Subcontractor, San Diego, CA) Procure and install, Expansion Joint Cover Assemblies, insulation, preformed metal, flashing and sheet metal, hatches and accessories, skylights, Kalwall insulated wall and envelope panels, louvers. Seven total buildings, 1000 sqs. Of materials. Projected completion date: August 2007.
El Centro Hangar: (Subcontractor, El Centro, CA) Procure and install 800 sqs of composite metal siding, liner panels, 400 sqs preformed metal over pre-engineered metal building structure, vinyl faced batt insulation. Completed date: February 2007.
2006 Glorietta Bay Master Plan Phase 1-B: (Subcontractor, Coronado, CA) Completed date: December 2006.
San Ysidro Field Office, Department of Motor Vehicles: (Subcontractor, San Diego, CA) Completed date: October 2006.
Glorietta Bay Master Plan Phase 1-B: (Subcontractor, Coronado, CA) Completed date: September 2006.
2005 P-751 Squadron Operations Facility: (Subcontractor, Coronado, CA) Metal envelope and wall panels, flashing and sheet metal. Completed date: December 2005.
Forced Intelligence Operations Center: (Subcontractor, Camp Pendleton, CA) Completed date: December 2005.
Amador County Animal Shelter Control & Adoption Center: (Subcontractor, Martell, CA) Metal panels, gutters and downspouts. Completed date: July 2005.
2004 Repair Metal Envelope 62 Area, Bldg. 620432 & 62433: (Subcontractor, Camp Pendleton, CA) Stainless Decks, Metal Panel and Deck Insulation, Modified Bitumen Cold Applied Envelope, Flashing and Sheet Metal, Steel Standing Seam. Competed date: October 2004.
Repair BEQ Phase I & II: (Subcontractor, Oceanside, CA) Demolition of existing, pre-engineered structural framing, 120,000 sq ft of preformed standing seam, sheet metal and skylights. Completed date: August 2004.
Repair BEQ Roofs, Areas 14, 24, 33, & 52: (Subcontractor, Camp Pendleton, CA) Steel Deck, Insulation, Sheet metal, Steel Standing Seam, Sealants. Completed Date: February 2004.
2003 P-556 Enlisted Dining Facility: (Subcontractor, San Diego, CA) Completed date: December 2003.
Repair Improve Mess Hall: (Subcontractor, Camp Pedleton, CA) Completed date: August 2003.
General Services: (Subcontract, San Diego, CA) 470 sqs preformed metal, over 470 sqs rigid insulation, 100 sqs sheet metal flashing and trim, 100 sqs composite metal wall panels and liner panels, louvers. Completed date: June 2003.
2002 Bldg. 243, Travis AFB: (Sacramento, CA) Furnish and install 55,000 square feet of new Klip Rib metal over a 3:12 pitch light gauge metal frame, miscellaneous sheet metal, expansion joints, louvers and R:30 batt insulation on existing built up. Retrofit completed during winter months. Completed date: 2002
2001 1 MEF: (Camp Pendleton, CA) Furnish and install 17,000 square feet of new metal over 30 lb. underlayment and all associated sheet metal trim. Completed date: 2001
Reserve Training Center: (Camp Pendleton, CA) Furnish and install 46,000 square feet of new metal and perforated soffit over 30 lb. underlayment and all associated sheet metal trim. Completed date: 2001
Tactical Vehicle Maintenance Facility: (Camp Pendleton, CA) Furnish and install 60,000 square feet of new metal and perforated soffit over 30 lb. underlayment and all associated sheet metal trim. Completed date: 2001
Integrated Hub Facility: (Camp Pendleton, CA) Furnish and install 13,000 square feet of new metal over 30 lb. underlayment and all associated sheet metal trim. Completed date: 2001
Armory Expansion: (Camp Pendleton, CA) Furnished and install 20,000 square feet of new metal and structural steel framing 30 lb. underlayment and all associated sheet metal trim. Completed date: 2001
2000 Bachelor Enlisted Quarters (Pico Area): (Camp Pedleton, CA) Furnish and install 28,000 square feet of metal over 30 lb. ASTM underlayment, fixed blade louvers and associated sheet metal trim. Completed date: 2000
Bachelor Enlisted Quarters (Del Mar Area): (Camp Pendleton, CA) Furnish and install 35,000 square feet of metal over 30 lb. ASTM underlayment and 2" poly iso insulation, fixed blade louvers and associated sheet metal trim. Completed date: 2000
Repair Lighting & Roof, Hangar #1: (Hill Air Force Base, UT) Repair, replace metal envelope and electrical systems on 150,000 square feet hangar, work included abatement of hazardous lead and asbestos materials, seismic retrofit of existing steel structure, 18 gauge metal decking, Z purlins 3" poly iso. insulation, and new standing seem in accordance with ASTM 1592. Completed date: 2000
Youth Center: (Point Magu Naval Air Station, CA) Furnish and install 15,000 square feet metal over 30 lb. ASTM underlayment, skylights, louvers, associated sheet metal trim and expansion joints for fast track project completed in three days. Completed date: 2000
Mark V: (Coronado Naval Air Station, CA) Install 65,000 square feet of radius metal, over 2,7" of poly ISO Insulation, over 16 gauge metal deck. Installation of 15,000 square feet insulated metal siding all accessories, angles, supports, downspouts, and gutters. Completed date: 2000
Bachelors Enlisted Quarters-Phase I, II, & III: (Mirimar Naval Air Station, CA) Installation of 85,000 square feet standing seam metal over metal deck. Scope includes all related trim and accessories. Completed date: 2000
1999 Fitness Center/Gymnasium: (Camp Pendleton, CA) Furnish and install 30,000 square feet of standing seam metal, 5,000 LTF 20 gauge Z purlins 3" Poly ISO Insullation over 20 gauge Acoustic deck. Completed date: 1999
Repair Hangar Doors-5 Bldgs.: (March Air Force Base, CA) Demolition and abatement of hazardous asbestos on five hangar doors, reframe and retrofit hangar doors with new siding, miscellaneous tracks, concrete and structural steel. The buildings were occupied during construction. Special care was required during abatement due to sensative nature in work performed inside the building. Completed date: 1999
Construction Package 14-Phase II: (Miramar Naval Air Station, CA) Install 90,000 square feet of 22 gauge Box Rib siding over structural purlins and 20,000 square feet of standing seam metal over 2" Poly ISO Insulation. Installation of 200 5x5' louvered skylight, expansion joints, infill panel and 6,000 LTF of custom fabricated reveal band. Completed date:1999
1998 MWSS: (Miramar Marine Corps Air Station, CA) Install 90,000 square feet of 22 gauge Box Rib Siding over structural purlins and 20,000 square feet of standing seam over 2" Poly ISO Insulation. Installation of 200 5x5 louvered skylights, expansion joints, infill paneland 6,000LTF of custom fabricated reveal band. Completed date: August 1998
Highbay Warehouse: (Camp Pendleton Oceanside, CA) Install 20,000 square feet vertical and horizontal composite siding over structural purlins. Scope included furring walls, expansion joints, skylights and all related trim. Completed date: 1998
MWSS-Maintenance Facilities-Phase 1: (Naval Air Station Miramar, CA) Install 90,000 square feet of 22 gauge Box Rib Siding over structural purlins and 20,000 square feet of standing seam metal over 2" Poly ISO Insulation. Installation of 200 5x5 louvered skylights, expansion joints, infill panel and 6,000 LTF of custom fabricated reveal band. Completed date: 1998
Bachelor Enlisted Quarters: (Travis Air Force Base Fairfield, CA) Install 45,000 square feet standing seem metal over 18 gauge metal decking. Install 10,000 square feet of composite fascia and wall panels, louvers and expansion joints. Completed date: 1998
1997 Controlled Industrial Facility: (Coronado Naval Air Station, CA) Install 80,000 square feet of 22 gauge Box Rib Siding, 20,000 LTF of hat channel support, 60,000 square feet of 2" insulation, all related trim, expansion seismic joints and fire barriers. Completed date: 1997
Bachelor Enlisted Quarters: (Edwards Air Force Base, CA) Installation of 70,000 square feet of standing seam metal and all related trim and accessories. Completed date: 1997
Fish and Wild Life Building: (Trinity Forest, CA) Demolition of 25,000 square feet of existing metal, installation of standing seem metal at four locations. Scope also includes repair of existing decks. Completed date: 1997
Bachelor Enlisted Quarters (Phase I & II): (Miramar Naval Air Station, CA) Furnish and install 180,000 square feet of standing seam metal on three-story quarters. Completed date: 1997
1996 Replace Metal at Building 66: (Prime contractor, San Diego Naval Air Station, CA) Completed date: December 1996.
|
|
|
|
|